Today, May 20th, construction begins on our new house with Excavation. Over the past 4 weeks, we have removed around 80 trees from the construction site / drain field area.
We had to remove some beautiful Oak trees as well as Poplar, Cottonwood, Birch and Pine Trees. Most will become firewood. We did save 2 large Oak Logs we will take to the sawmill and use for something in the future.
I also bought a small / low-cost drone to document the construction process; I plan to take the same picture every day. The drone is a Potensic Atom with a 3 axis gimble for the video camera.
Here is my first public video with the drone.
Views: 29
Leave a Reply