Wow. Lots done this week. The roof was completed. The front porch is mostly done as well as the back deck. The basement floor was insulated with rigid foam and the in-floor heating coils and manifold were installed. The basement floor and Patio cement were poured.

Most of the windows were installed along with the fireplace.

The septic system was competed in 1/2 of a day on Tuesday. There is a timelapse video below short with my drone. There are also pictures here.

Timelapse: Week of July 22nd
Drone Video: Friday, July 26th
Drone Timelapse: Installing Septic System

Views: 3090

5 Comments

  1. Marge

    Very nice. When are you expected in?

    • Kelly

      Our deadline is October 16th.

      If everything stays on track, we think we can get occupancy mid-September. Fingers Crossed!!

  2. Nancy & Scott

    Great update!

  3. Robert Slocum

    I have been watching the progress from the start ; brings back memories of the time we built our log home . you probably remembered to have the electrician put outlets in the great room floor so you can float furniture —we almost forgot! Beautiful Home ! Bob Slocum

  4. Robert Slocum

    Been watching from the start; beautiful Home!

Leave a Reply

Your email address will not be published. Required fields are marked *

© 2025

Theme by Anders NorenUp ↑