After a week of delay due to rain, we were finally able to pour the basement footers and walls. The house location worked out perfectly being 12 feet from the left lot line. This gives us as much room as possible for the septic system.
Views: 20
After a week of delay due to rain, we were finally able to pour the basement footers and walls. The house location worked out perfectly being 12 feet from the left lot line. This gives us as much room as possible for the septic system.
Views: 20
Theme by Anders Noren — Up ↑
Leave a Reply